East London Bowl

1 Finalized 3D model

  1. 1 Finalized 3D model
  2. 2
  3. 3 Materials arrived a week late
  4. 4 Making progress with transition framework
  5. 5 Laying out framework according to rolled steel
  6. 6 Bowl framework complete
  7. 7 Waiting for sublayer of plywood
  8. 8 Plywood has been placed, time for a test run
  9. 9 Most of the plywood sublayer placed
  10. 10 Final layer of 6.4mm tempered hardboard going down